Added: 05/15/2014

Over 80sqft master bathroom.

Customer's choice is heating cable system, which will be installed on top of plywood subfloor, following by ceramic tile installation.
Installation is very simple, only four 3-4ft wide rows at 3" spacing.
HTCBLKIT-120-200 is suggested size of heating cable for overall coverage: 200ft long cable, 7-Day programmable "Honeywell/Aube" thermostat with floor sensor and 25ft long roll of cable guides.